Hitomi Villa interior design render in Bali

Live case study · construction in progress

Hitomi Villa

A half-built Bali villa renovation carried from planning and material direction through renders, drawings and active construction.

Image: approved 3D render
LocationBali, Indonesia
Starting pointHalf-built villa
Current statusUnder construction
Our scopeDesign · drawings · supervision · construction

The project

From the existing shell to design and site follow-up.

Hitomi Villa shows how design decisions connect to drawings and real construction. Renders are labelled as renders and site photographs as work in progress, so clients can see exactly what was designed and what is being built.

01 · Read the existing shell

The project began as a half-built villa. We reviewed the existing condition, spatial relationships and circulation before developing the visual language.

02 · Layout and direction

The spatial layout, material direction and colour language were resolved before the final renders were approved.

03 · Visualize and approve

We translated the decisions into clear 3D views for the living areas, bedrooms, courtyard and bathrooms.

04 · Coordinate the drawings

After design approval, the agreed plans and details were prepared to guide site delivery and contractor coordination.

05 · Deliver on site

The project is now under construction in Bali, with site follow-up and real progress documentation.

Design direction

Materials and colour before detail.

The mood board established the atmosphere and material references before those decisions were developed into a coherent response to the existing villa.

Hitomi Villa mood board and material direction
Design stage · mood board

3D Visualization

Approve the rooms before building.

Selected approved project renders, not completed-construction photography.

Living room render
Approved 3D render
Bedroom render
Approved 3D render
Courtyard and pool render
Approved 3D render
Bedroom suite render
Approved 3D render
Bathroom render
Approved 3D render

Drawing package

Turning the design into site information.

Only selected excerpts are shown. The complete project file follows the agreed drawing schedule.

Hitomi Villa floor-plan excerpt
Floor plan · excerpt
Hitomi Villa interior-detail excerpt
Interior detail · excerpt
Hitomi Villa joinery-drawing excerpt
Drawings and details · excerpt

On site

Real construction. Ongoing documentation.

Progress from reinforcement, concrete work and opening preparation during construction.

Real site video · roof-slab work in progress
Formwork preparation
Formwork preparation · work in progress
Reinforcement preparation
Reinforcement preparation · work in progress
Steel work on site
Steel work on site · work in progress
Concrete surface finishing
Concrete surface finishing · work in progress
Opening preparation
Opening preparation · work in progress
Site carpentry
Site carpentry · work in progress

HITOMI / SITE PROGRESS

From the site: work in progress.

Documentation of masonry and formwork at Hitomi. The project is under construction; these images show the stage recorded in the available material.

Masonry and formwork at Hitomi Villa
Masonry and formwork overview · work in progress
Masonry work with measuring tools at Hitomi
Masonry detail · work in progress

From the site-progress files supplied in October 2026. These show building work, rather than furniture production or final handover.

Hitomi Villa site diary: 8–9 November 2026

The opening in the slab is easiest to read from above. The timber below it is temporary formwork; the closer photographs show the crew finishing the concrete edge. These are photographs of the renovation in progress.

Overview of the slab opening and its temporary timber supports
Overview of the slab opening and its temporary timber supports
Workers positioning a corrugated sheet above the temporary supports
Workers positioning a corrugated sheet above the temporary supports
Hand-finishing the concrete surface at the edge
Hand-finishing the concrete surface at the edge
Seven more photographs: site work and surroundings
Crew working behind the upper-level timber formwork
Crew working behind the upper-level timber formwork
Moving a timber board across the work area
Moving a timber board across the work area
Work beside the exposed reinforcement at the slab edge
Work beside the exposed reinforcement at the slab edge
Upper-level work beside the pitched roof framing
Upper-level work beside the pitched roof framing
Finishing an edge beside a pipe opening
Finishing an edge beside a pipe opening
Surrounding area: view across the rooftops
Surrounding area: view across the rooftops
Surrounding area: evening view near the site
Surrounding area: evening view near the site

Walk the upper level, then see it from above

Watch the site film on YouTube

CLEAR SCOPE FOR EACH PROJECT

Your project has its own details. And its own proposal.

We review the location, existing condition, area, drawings and required services. Design, documentation, site follow-up and construction are scoped individually, with deliverables, timeline and payment terms in a written proposal.

Enquire about a similar project

ELEMENTS / YOUR PROJECT

Have a project in mind?

Share the location, type of space and service you need. We define the scope and deliverables together, then prepare your proposal.

Tell us about your project